Carbon Structural Steel Supply to Dammam

Carbon Structural Steel sourced from Indian mills for buyers in Dammam
Carbon Structural Steel

From single bars to bulk orders, Carbon Structural Steel for structural frames, supports and general fabrication is supplied to Dammam by Steel Exchange, Mumbai. Ask for IS 2062 E250 and equivalents by grade, size and condition and we will quote with the lead time split between stock and mill-rolled material.

Buyers in Dammam come to Steel Exchange for Carbon Structural Steel when the grade, size or quantity does not fit a standard mill order. We supply IS 2062 E250 and equivalents for structural frames, supports and general fabrication, with the supply route named before you order.

Buying from outside Dammam? See our main Carbon Structural Steel page for the full grade and size range, or browse all steel we supply in Dammam.

  • Custom order available
  • Pan-India delivery
  • Mill test certificate
  • 24hr quote response
Registered and verifiable

Every number on this page can be checked

We are a procurement business, not a manufacturing unit, so we do not hold ISO 9001, IATF 16949 or a BIS licence — those certifications belong to the mills we source from and cover their production. What we do hold are the statutory registrations that let us trade, invoice and export, and each one is independently verifiable on a government portal.

ABZ-4704
LLPIN
MCA, 15 Dec 2022
27AATFT9502H1ZN
GSTIN
Maharashtra, Regular
AATFT9502H
IEC
DGFT Mumbai, 2026
UDYAM-MH-19-0195430
Udyam / MSME
Micro, Trading
DIPP135219
DPIIT Startup
Valid to Dec 2032
MCA
Company record

Incorporation certificate, partner details and annual filings are on public record against LLPIN ABZ-4704.

GST
Tax invoice

Valid tax invoice with HSN code on every order, so input tax credit is available against every purchase.

DGFT
Export capability

IEC issued August 2026. The capability is current; we do not claim a long export history.

You May Also Like

Other Carbon Steel Products for Dammam

Grade, Size, Quantity, Inspection Requirement

We come back with the source named and the lead time split between stock and mill-rolled material — so your planning is based on a real date, not an optimistic one.